U.S. REPRESENTATIVE · TEXAS · TX-14

Rep. Randy K. Weber, Sr.

Texas state page · Official site ↗

FY2027 REQUESTS

19

ASKED

$503.31M

EARMARKS ON RECORD

6

TOTAL

$19.04M

FY2027 · WHAT THEY ASKED FOR

Requests, not money. Most are never funded.
19 requests · $503.31M askedOFFICIAL DISCLOSURE ↗
City of Beaumont, Texas, Public Safety Technology and Infrastructure Improvements · Beaumont$1M
City of Hitchcock Wastewater and Sewer Infrastructure Improvements · Hitchcock$3M
Coastal Texas Protection and Restoration Project (Coastal Texas Project) · Galveston$25M
Galveston County Strategic Floodplain Acquisition and Regional Flood Mitigation$7.5M
Galveston Harbor & Channel, Texas Operations and Maintenance - Federal Navigation Project · Galveston$60M
Gulf Coast Water Authority Environmental Infrastructure Resiliency Improvements - May Pumping Plant (Pumping Plant No. 2 Modernization)$2.5M
Jefferson County, Texas, Emergency Operations Center (EOC)$4M
Lamar State College Port Arthur Advanced Terminal Workforce Development - Phase 2 (AT-Work) · Port Arthur$7.1M
Port Freeport Inner Harbor Berth 3 Modernization · Freeport$11.06M
Port of Beaumont Low Line Rail · Beaumont$10.51M
Port of Galveston Overhead Walkway and Pedestrian Safety Features · Galveston$5M
Port of Galveston Pelican Island Berth Engineering · Galveston$3.2M
Port of Orange Dravo Industrial Terminal Bulkhead - West Side · Orange$9.81M
Port of Orange Improve Rail Reverse Curves from South Childers to Alabama Street Terminal Docks/Warehouses · Orange$8.73M
Port of Port Arthur Portside Intermodal Cargo · Port Arthur$12M
Port of Texas City Port Freight Safety and Efficiency Improvements · Texas City$4.36M
Sabine-Neches Waterway Channel Improvement Project, Texas$319M
Texas A&M University at Galveston Institute for Disaster Resilient Texas - Online Disaster Risk Assessment and Communication Tool · Galveston$7.55M
University of Texas Medical Branch (UTMB) Galveston New Approach Methodologies Repository & Shared-Service Center for Advancing Biomedical Research · Galveston$2M

FY2026 · WHAT CAME HOME

6 earmarks · $19.04M
Sabine—Neches Waterway, TX; U.S. Army Corps of Engineers$9.06M · Energy-Water
Coastal Texas Protection and Restoration Study, TX; U.S. Army Corps of Engineers$5M · Energy-Water
Advanced Terminal Workforce Development Center (Lamar State College Port Arthur)$2M · T-HUD
Texas A&M AgriLife Texas Gulf Coast Oyster Research (Texas A&M AgriLife Research) · Galveston County$1.25M · CJS
Street Reconstruction— Phase I (City of West Columbia) · West Columbia$1M · T-HUD
Rehab for Lexington Square (City of Angleton) · Angleton$730K · T-HUD

Amounts link to the official disclosure table. Items requested jointly list every requester in the source.

Matched from the verified earmark record and the member's official disclosure page. Joint requests are credited to each named member; nothing is attributed on a guess.